Sahara Facility Cyclone posts

Image
Mar. 05, 2025

Canadian Operator Reduces Labor Costs by 40% with Sahara Facility Cyclone

Cost Savings Case StudyOptimize labor costs, minimize emissions, and improve efficiency with the Sahara Facility CycloneLocation: CanadaThe Problem:A major producer in the Montney zone in Canada had a 10-well pad in the steady state phase and was looking to cut costs and make production more efficient. They had been using individual well desanding units for each well, which required the Read more
Image
Mar. 05, 2025

Optimize labor costs, minimize emissions, and improve efficiency with the Sahara Facility Cyclone

High volumes of sand are typically associated with the flowback stage. This is when operators need to use sand management equipment to ensure no sand gets into the production facility and causes extensive damage.  However, in many cases, operators still see high volumes of sand during the steady state phase as well. While the sand volume isn’t typically high enough Read more
Image
Feb. 25, 2025

No matter what your sand management plans are, EnerCorp can help

We’ve got an innovative solution for every sand management challenge The oil and gas industry evolves quickly. Impacted by global markets, geographic terrain, consumer sentiments, and investor attitudes, there is no shortage of change. That’s why it’s important for operators to work with partners that can support them with a number of different applications so they are not always scrambling Read more
Image
Feb. 20, 2025

What an innovative production equipment fabrication shop looks like

EnerCorp offers production fabrication for flowback equipment and beyond Some operators choose off-the-shelf equipment like sand filters and oilfield separators; however, many know that a customized piece of production equipment — that is crafted according to the requirements of your well — yields better performance.  Customized equipment puts innovation at the forefront, by thinking ahead to potential obstacles and developing Read more