Top Hole posts

EnerCorp-Surface-Drilling-Bigger-isnt-always-better-v1.2
Jun. 13, 2022

See the difference a surface drilling rig can make

Are you still using a full-size rig to drill your top-hole section? Full-size rigs are designed to construct wells with total depths greater than 20,000 feet. This results in high equipment day rates with a massive crew to staff the rig, and generates a high amount of emissions. When you’re drilling surface intervals and running surface casing, you don’t need a full-size rig. Read more