Aug. 16, 2022
THE TIME TO OPTIMIZE IS NOW
In traditional flowback and sand management operations, there is a large equipment footprint, as well as high day rates. The risk for HSE exposure is high, as is the number of personnel on the field. What if you could optimize the desanding equipment during flowback and maximize your production without a temporary separator? Read more
Aug. 10, 2022
SAND MANAGEMENT 101
If you follow our social pages you know we talk a lot about sand management. Do you know what sand management is? Read more
Aug. 10, 2022
Making clients happy one custom fabrication job at a time
We are excited to showcase another industry leading closed loop sand cyclone system going out for another Canadian client from our state of the art production fabrication shop. Read more
Aug. 08, 2022
SHRM 2022
At EnerCorp, we are committed to continued improvement and training. This is true for our field operations as well as our office staff. Read more
Aug. 08, 2022
SLEEP SOUND WITH eFlowback
We know it isn’t quite time to start singing Christmas carols, but all this summer heat has us dreaming about cooler weather. Maybe a little summer carol about sand management will make spirits bright! Read more
Aug. 08, 2022
Get more with less with fit for purpose equipment
Using fit-for-purpose equipment, such as a surface drilling rig over a full size rig, can help operators get more benefits with less equipment. Read more
Jul. 28, 2022
HELPING REDUCE COSTS IN THE HAYNESVILLE
A client in the Haynesville was looking to reduce expenses while eliminating the need for coiled tubing to drill out plugs. This posed a major challenge for the customer because the lack of coiled tubing meant that more sand would be brought to the surface during flowback. Read more
Oct. 16, 2023
Why are you incurring the cost of utilizing temporary test separators during your flowback?
Today, it’s common for operators to use test separators in the flowback space. Traditionally, these pieces of equipment. Read more