The following case study is from a project in the Delaware Basin and a great example of why EnerCorp is the leader in Sand Mangement Solutions and technology.
THE CHALLENGE
A well production history with a high sand return. Sand that was coming from a well along with effluent was accumulating into a separator. An accumulation of sand leading up to daily well shut in and several days of downtime.
THE SOLUTION
Within 3 weeks of the EnerCorp Sand Cyclone and Filter installation, the well was opened up to 64/64” choke, oil production had increased 100% and gas production to 89% from the previous amount, eventually leading zero downtime.