NORTHEAST, USA CASE STUDY

Share this Post

NE USA Graph

The wells, which are almost completely dry gas, with a 98% methane gas comp. They aren’t making much water either, at just under 10 bbls per hour.

EnerCorp installed a 100 micron screen in one of the units, and it has not restricted the flow whatsoever. They also have a high pressure differential ESD.

  • 25MMSCFD Gas dry well with 10 bph condensate.
  • Over 3,000lbs of sand removed over a 9 week sand management job
NE USA image 1
NE USA image 2