
Apr. 24, 2026
MidCon operator eliminated sand carryover without changing their flowback crew.
A MidCon operator had a sand carryover problem. They also had a flowback crew they trusted. They weren’t looking to hand the job to someone else. They needed better equipment. With Sahara Rentals, they kept their existing crew and added the Sahara Advanced Sand Cyclone to their program. Sand carryover was eliminated. They saved several hundred dollars per day across Read more

May. 07, 2025
How a Canadian Operator Reduced Labor Costs by 40%
Reducing labor costs without compromising performance? That’s exactly what this Canadian operator achieved. When EnerCorp introduced the Sahara Facility Cyclone to their operations, they didn’t just reduce sand-related issues—they cut labor costs by 40%. Fewer interventions.More uptime.Smarter sand management. The Sahara Facility Cyclone was custom-designed to meet their facility’s exact needs—and the results speak for themselves. Read more

Jun. 19, 2024
Making Data-Driven Decisions for Advanced Operations
Our latest case study showcases how our data-driven approach prevented erosion damages for one of our clients in the Permian basin. The Problem:During routine monitoring, our team noticed extremely high velocity on the inlet of the Sahara Advanced Sand Cyclone, signaling potential damage in the making. The Solution:Utilizing our proprietary Sahara Speedometer & Sand Management Report PowerBI Dashboard, we swiftly Read more
