Canadian operator cut labor costs 40% and captured 99.9% of sand with the Sahara Facility Cyclone.
A Canadian operator was moving 12,000 pounds of sand per day through their facility. Labor costs were high. Sand capture wasn’t where it needed to be.
The fix wasn’t more people or more process steps. With the Sahara Facility Cyclone, they achieved 99.9% sand capture and cut labor costs by 40%. The same volume of sand, handled more efficiently, with less exposure for the people on site.
That’s what happens when you build your sand management system around the right equipment. The work gets easier. The numbers get better. The crew gets home safer.