Case Study posts

Image
May. 14, 2021

Case Study: Major Producer in the Delaware Basin

On the tankless facilities (satellite facility) liquid, EnerCorp Transfer Pumps were used to send oil and water to remote storage facilities. Sand, that was coming from the well, and effluent were accumulating into a separator, which led to a reduction of separator retention time. Sand that flowed from an oil and water line was also causing Transfer Pumps (ceramic) seals and bodies to wash out. Read more
Image
Apr. 30, 2021

Case Study: North Dakota – 3000PSI Dual Cyclone

EnerCorp was called into a project, mid-week, with a report of a sanded-off wellhead. The client’s nearby well had a ‘zipper frac,’ and communicated with a preexisting well that had been on an artificial lift. EnerCorp arrived on location at 8:00am, bled off and rigged out the preexisting flowline. Read more
Image
Apr. 30, 2021

Case Study: NE, USA

EnerCorp was called into a project, mid-week, with a report of a sanded-off wellhead. The client’s nearby well had a ‘zipper frac,’ and communicated with a preexisting well that had been on an artificial lift. EnerCorp arrived on location at 8:00am, bled off and rigged out the preexisting flowline. Read more