
A 2-mile lateral in the Permian Basin brought record-high sand production, the kind of well that exposes every weakness in a one-size-fits-all sand management setup.
EnerCorp’s Sahara Advanced Sand Cyclone was configured specifically for that well’s characteristics, not pulled off a shelf.
Over 71 days, the results held up under real pressure:
✅ Week one: 429,066 lbs of sand captured at 99.5% efficiency
✅ Weeks two through six: 1,288,598 lbs captured at 99.7% efficiency
✅ Full 71-day total: 1,541,558 lbs captured, with only 175 to 200 lbs reaching the production facility
✅ Sustained rates above 5,000 lbs per hour with just two operators per shift
That is what happens when the same team designs, builds, and operates the equipment. Application engineering is not a marketing phrase at EnerCorp, it is the reason results like this are repeatable.
Share this Post




