Flowback 2.0 posts

Image
Jan. 05, 2026

Sahara Advanced Sand Cyclone 97%+ Sand Capture Rate: Why We Trust Our Numbers—And You Should Too

Our claims aren’t marketing—they’re based on real data.  At EnerCorp, we don’t make claims without the engineering and data analysis to back it up. It’s how we’ve always done things. That’s why when we say our Sahara Advanced Sand Cyclone has a sand capture rate of 97%+, our customers know they can trust in those numbers. Our claims aren’t marketing Read more
Emission Case Study
Sep. 11, 2025

New EnerCorp Customer Captures 100% of Sand with the Sahara Advanced Sand Cyclone

Sahara Advanced Sand Cyclone Case Study New EnerCorp Customer Captures 100% of Sand with the Sahara Advanced Sand CycloneLocation: PermianThe Problem An operator in the Permian was using 2 spherical style sand separators on their wellsite. However, this equipment was ineffective, allowing a lot of sand to enter and damage their facility equipment. In addition, they didn’t have an accurate Read more
Emission Case Study
Dec. 08, 2023

South Texas Operator Reduces Emissions and Sand Erosion Damages with Flowback 2.0

Our team of engineers suggested the operator consider Flowback 2.0 with the Sahara Advanced Sand Cyclone. It would enable them to remove the test separators all together and eliminate any sand issues at their production facility. Read more
Flowback-2.0-Eliminates-Sand-Issues
Oct. 16, 2023

Flowback 2.0 & Sahara Sand Cyclone Success in South Texas

Are you tired of dealing with sand carryover in your facility that leads to high damage costs? Do you want to reduce your equipment footprint, cut down on personnel costs, and create safer operations? Read more
Permian eFlowback
Oct. 16, 2023

eFlowback Manages Over 2,000 lbs of Sand Per Hour In Permian

An operator in the Permian was completing new wells and was looking for an innovative flowback solution that wouldn’t leave them dealing with high sand carryover rates at their production facility. Read more
south-texas-case-study
Oct. 16, 2023

Flowback 2.0 Eliminates Sand Issues While Reducing Footprint in South Texas

Our application engineering team met with the customer early on in the process to better understand their requirements, goals, and needs — as well as what obstacles were standing in their way. Read more
sahara-haynesville
Oct. 16, 2023

Haynesville Operator Saves Big with Sahara Advanced Sand Cyclone

Over 25 days of flow, the Sahara Advanced Sand Cyclone captured 32,248 lbs of sand, which is a sand capture rate of 99.9%. Read more
How-efficient-is-your-flowback
Oct. 26, 2023

Efficiently Manage your Flowback Operations with EnerCorp

Wondering how to make your flowback operation more efficient? Read more
featured-image-sahara-advance-cyclone
Oct. 16, 2023

How a superior process produces superior outcomes

It’s true that all wells are unique, but there are certain wells that stand out. Whether it’s because of the geography, sand production rate, well pressure, or flow rate, some wells start out with a bang. However, whether a well is predictable or unusual, they require skilled service providers that have a superior process in place — backed by application engineers and highly experienced field personnel — to bring the process to life. This is how EnerCorp ensures superior outcomes for our customers. Read more
featured-image-enhance-production-while-lowering-costs
Oct. 16, 2023

How to enhance flowback while lowering your costs

Enhancing production, lowering costs; These two goals are priorities for every operator. However, not all service providers prioritize these two goals for their customers, which can lead to long-term dissatisfaction. Read more