Delaware Basin Case Study Video

Delaware Basin Sand Solutions

Share this Post

Another example of why EnerCorp is the leader in Sand Mangement Solutions and technology.

Case Study: EnerCorp in the Delaware Basin

Problem: A well production history with a high sand return. Sand that was coming from a well along with effluent was accumulating into a separator. An accumulation of sand leading up to daily well shut in and several days of downtime.

The EnerCorp Solution: Within 3 weeks of the Sand Cyclone and Filter installation, the well was opened up to 64/64” choke, oil production had increased 100% and gas production to 89% from the previous amount, eventually leading zero downtime.

Be sure to subscribe to the EnerCorp Sand Solutions YouTube channel to receive notifications when we post new videos and resources.