SAHARA ADVANCED CYCLONE CAPTURES SAND FOR EXTENDED LATERALS IN THE HAYNESVILLE

EnerCorp-Haynesville-Success-Extended-Lateral
EnerCorp-Haynesville-Success-Extended-Lateral

A customer in the Haynesville was looking to bring wells that had lateral lengths extending beyond 15,000 feet and stage counts in excess of 65 online. High has production, high casing pressure, and excess sand was expected during flowback.

The EnerCorp sales and engineering team worked with the customer to develop the solution needed for these specific sand management challenges.

The custom solution of a 15k Sahara, with an engineered pipe and nozzle sizes, and flawless operational execution captured the sand with no carry over to downstream equipment.

Learn more about this EnerCorp success in the Haynesville

Share this Post