Frac Valves and
Zipper Manifold Rentals

Eliminate non-productive time in your hydraulic fracturing operations.
GET IN TOUCH
Invest in quality

Time is money.
We make sure you don’t waste it.

The demanding conditions frac valves need to operate under in the typical North American shale stimulation job are daunting. Millions of pounds of sand are pumped at high rates. As a result, any leaking valve assemblies in your equipment lead to non-productive time and very costly delays on your wellsites.
Quality frac valve cut away view

To ensure you don’t face these challenges, we invest in:

High-quality valves manufactured in North America

Premium erosion-resistant materials

A rigorous inspection and rebuild procedure

A strong quality assurance program


An incremental investment in our frac valve and zipper manifold ensures flawless execution on the wellsite. You’ll see high ROI when we eliminate the unnecessary expense of excess NPT.

Contact us today to learn more about how EnerCorp’s trusted engineers and field experts can help you make the most of your time.

FIND OUT HOW
Display 7 Steps to reduce NPT 2021 - EnerCorp
GET IT NOW

Dealing with unnecessary non-productive time during your hydraulic fracturing operations and flowback?

Faulty and unreliable frac valves could likely be one of your problems. Keep in mind that a frac valve is only new once — and unless your frac valve rental company has a rigorous QA/QC process, you may have to deal with costly issues.

Download 7 Steps to Reduce NPT with Flawless Frac Valves and learn what you need to look for when renting frac valves.


DOWNLOAD NOW
ENERCORP FITS-FOR-PURPOSE

The right solution for each job

Our sales and engineering teams learn more about your wellsite and application to provide you with just the right equipment — and nothing more. Not only do we elimine NPT, we offer cost-effective and fit-for-purpose solutions.

Highlights of our refined quality management ecosystem:


USA-manufactured frac valves in both 5-1/8” and 7-1/16” sizes available as manual and hydraulic actuated

Capable of supporting requirements up to 15,000 psi working pressure

Ability to configure zipper manifolds and monoline setups to support your stimulation needs

EnerCorp’s offerings can be prepared to support toe prep, hydraulic fracturing, drillout, and flowback operations


It’s time to move forward with high-quality materials. Get in touch with us today so we can provide you with the right solution for your wellsite.

GET STARTED
frac stack flowback equipment
3D Frac Valves
switches and toggles for fracking


Click Graphic to Enlarge

quality care

Our industry-leading maintenance and quality assurance program leads to flawless execution

A valve is only new once.

That’s why we increase the quality of care after the initial use. After each deployment, our valves are completely disassembled. All components are rigorously inspected and measured to ensure conformance with manufacturer-specified tolerances. Then, we make any repairs and replacements as needed.

All seals, packing, and miscellaneous soft goods are replaced with OEM parts after each job. Every remanufactured valve assembly is pressure tested and tagged with those test chart results. Before equipment is sent to the jobsite, we complete a thorough pre-mobilization checklist to ensure all the necessary quality assured components are loaded out. 

Finally, all valves are function tested from top to bottom at the job site. We also conduct pressure testing in line with your procedures.

Zero npt?

Get to know EnerCorp’s QA/QC process

Your goal is zero NPT. Our frac valves ensure you get there. Learn more about our frac valve care and maintenance process and how we ensure our technology is ready for anything your job site throws at us.
TELL ME MORE
Eliminating NPT

What does this mean for you? Peace of mind.

You don’t have to deal with leaking valve assemblies ever again, eliminating the resulting NPT.

Tell us your requirements so we can develop a tailored plan for your wellsite.

CONTACT US

  • Image
  • Image

Ready to minimize your NPT?

CALL US TODAY