Case Study posts

Haynesville Case Study featured image
Feb. 17, 2022

Haynesville client mitigates HSE risks and lowered non-productive time with 99.7% sand capture

Over the course of the 35-day flowback, the custom-engineered solution flawlessly executed the job. The client experienced no sand carry over to downstream equipment and zero washouts in the iron, manifold, or test separators. Read more
EnerCorp Sahara Haynesville - Case Study - 28-01-2022 - artwork
Dec. 15, 2022

Operator in Haynesville saves over $16,000 in Flowback Chargebacks

As expected, the Sahara Advanced Cyclone captured well over 97% of sand and prevented carry over to downstream equipment, saving thousands. Read more
eFlowback in the permian case study
Nov. 08, 2023

Permian operator saves 26% on the day rate with eFlowback

eFlowback, which combines automation, measurement systems, and cloud-based software, enables operators to enter the next level of flowback. Read more
EnerCorp case study social Sahara reduces damage charges in the haynesville
Nov. 16, 2021

Sahara Advanced Cyclone reduces damage charges in the Haynesville by capturing over 99% of sand

Over the course of the 16-day flowback, the Sahara Advanced Cyclone captured well over 99% of the sand produced on this well. See the results. Read more
EnerCorp Case Study image for Sahara + Thermal Imaging
May. 11, 2021

Sahara Advanced Cyclone Captures Over 99% of Sand

Thermal imaging shows EnerCorp’s Sahara Advanced Cyclone captures over 99% of sand, keeping test separators clean. Read more
Production Equipment Case Study
May. 14, 2021

Production Equipment Case Study

EnerCorp Creates Customized Sahara Advanced Cyclone for Supermajor IOC Read more
Image
Apr. 30, 2021

Haynesville Shale Flowback Case Study

EXPERIENCE MATTERS Mojave Dual Cyclone reduces chargeback expenses by $25,587 on 15-day flowback jobShare this PostHaynesvilleShale IP Peak 5 MMSCF/ day Gas 100 BBLs/ day Water 1500 psiflowing pressure THE PROBLEM Sand production in the Haynesville requires operators to run multiple cyclones as well as a three-phase test separator at the same time to prevent sand from getting into their production facilities and Read more
Image
Apr. 30, 2021

Marcellus Shale Flowback Case Study

EXPERIENCE MATTERS EnerCorp’s Sahara Advanced Cyclone significantly outperforms competitor “advanced” cyclone in the Marcellus ShaleShare this PostMarcellus ShaleDry Gas Well IP peak > 5 MMSCF/ day Gas Average 55 BBLs/ day Liquid 400 psiflowing pressure 1 Daysof flowback used for comparison THE PROBLEM Our client was using multiple different sand separators in series as part of their flowback as well as during the early Read more
Image
Nov. 08, 2023

Permian Basin Flowback Case Study

EXPERIENCE MATTERS EnerCorp’s Sahara Advanced Cyclone technology captures 99.7% of sand in the Permian BasinShare this PostDelaware BasinLocation 500 BBLs/ day Oil 2800 BBLs/ day Water 1500 MCF/ day Gas 400 psiat peak flow rate 0 Daysof flowback 20000 lbsof sand produced THE PROBLEM One of our valued clients was running two sand separators and a three-phase test separator during their flowbacks. However, the production facilities Read more
Image
May. 10, 2021

Case Study: Delaware Basin Video

A well production history with a high sand return. Sand that was coming from a well along with effluent was accumulating into a separator. An accumulation of sand leading up to daily well shut in and several days of downtime. Read more