CASE STUDIES
WE STAND BEHIND OUR PRODUCTS AND GUARANTEE 100% SATISFACTION.
Read our case studies for insights, experiences, and success stories from industry leaders who trusted in EnerCorp’s experience and technology.
Operator Saves 26% on the Day Rate With eFlowback
- Optimize the workforce by reducing the number of personnel to one per location (compared to four with Flowback 2.0), and thereby lowering HSE exposure.
- Gain efficiency of operation and accurately weigh 800 lbs of sand with the Sand Quantification Unit at one time, compared to 50 lbs as done previously.
- Minimize high-exposure tasks such as auto-dumping sand from the cyclone. This task is now fully automated, which eliminates the potential for human exposure.
- Eliminate limits on their choke schedule and blowdowns as compared to what can be done manually. There is no need to hold chokes at certain sand rates because eFlowback captures and weighs exceptionally high quantities of sand.
- Gain consistent data collection, such as sand quantity and choke position. This helps make better decisions on how to open the wells. Accurate data collection also helps the customer correlate completions and flowback. The data collected is safe and secure at all times.
- Improve environmental security by safeguarding against any leaks to the atmosphere and the surrounding environment.
SAHARA REDUCES DAMAGE CHARGES IN THE HAYNESVILLE BY CAPTURING OVER 99% OF SAND
Over the course of the 16-day flowback, the Sahara Advanced Cyclone captured well over 99% of the sand produced on this well. The result? Minimal washed parts downstream of the Sahara. A photo of the stem on the separator dump valve is shown to the right – it is in like-new condition post-job showing no wear or damage.
With the Sahara Advanced Cyclone, this client was ensured that no sand was making it to the production facility — reducing damages to the permanent facility and eliminating any need for cleanout operations and the associated cost.
Want the same results at your wellsite in the Haynesville Shale? Contact EnerCorp today to speak with our highly trained team about your application. We’ll understand the specific requirements of your well and propose a setup that gets the results you’re after.
OUTPERFORMS COMPETITOR “ADVANCED” CYCLONE IN THE MARCELLUS SHALE
SAHARA TECHNOLOGY CAPTURES 99.7% OF SAND IN THE PERMIAN BASIN
More Case Studies
EnerCorp Saves Client from Erosion Damages with Data-Driven Technology
Case Study, Oil And Gas, Oilfield, oilgas, Sahara Advanced Cyclone, Sand Management, OptionalData-Driven Case StudyEnerCorp Saves Client from Erosion Damages with Data-Driven TechnologyLocation: PermianThe ProblemOne of EnerCorp’s clients in the Permian region had their wells open and flowing for several weeks when we noticed...
South Texas Operator Reduces Emissions and Sand Erosion Damages with Flowback 2.0
Case Study, Flowback 2.0, Oil And Gas, Oilfield, oilgas, Sahara Advanced Sand Cyclone, OptionalOur team of engineers suggested the operator consider Flowback 2.0 with the Sahara Advanced Sand Cyclone. It would enable them to remove the test separators all together and eliminate any sand issues at their production facility....
EnerCorp’s ScorpionXT Sand Filter Eliminates Washouts and NPT Increasing Production by $252,000 Per Month
Case Study, NPT, Oil And Gas, Oilfield, oilgas, Scorpion XT, South Texas, OptionalEnerCorp drastically reduced the sand issues this South Texas operator was having by putting the ScorpionXT Sand Filter in line at the surface....
eFlowback Manages Over 2,000 lbs of Sand Per Hour In Permian
Case Study, eFlowback, Fit-for-purpose, Flowback 2.0, Oil And Gas, Oilfield, oilgas, Sand Management, OptionalAn operator in the Permian was completing new wells and was looking for an innovative flowback solution that wouldn’t leave them dealing with high sand carryover rates at their production facility....
Flowback 2.0 Eliminates Sand Issues While Reducing Footprint in South Texas
Case Study, Flowback 2.0, Oil And Gas, Oilfield, oilgas, Sahara Advanced Cyclone, South Texas, OptionalOur application engineering team met with the customer early on in the process to better understand their requirements, goals, and needs — as well as what obstacles were standing in their way....
Haynesville Operator Saves Big with Sahara Advanced Sand Cyclone
Case Study, Flowback, Flowback 2.0, Haynesville, Oil And Gas, Oilfield, Sahara Advanced Cyclone, Sahara Cyclone, OptionalOver 25 days of flow, the Sahara Advanced Sand Cyclone captured 32,248 lbs of sand, which is a sand capture rate of 99.9%....
EnerCorp Manages Largest Sand Producer In Company History in the Permian
Case StudyAfter 71 days, equipment was temporarily removed for artificial lift installation. Over the entire job, EnerCorp’s primary Sahara captured 1,541,558 lbs of sand and the secondary Sahara captured 6,968 lbs of sand. Our overall sand...
Haynesville Customer Saves Big On Coiled Tubing and Sand Carryover Damage Costs with EnerCorp
Case Study, Flowback, Flowback 2.0, Haynesville, Oil And Gas, Oilfield, Sahara Advanced Cyclone, Sahara CycloneCost Savings Case StudyHaynesville Customer Saves Big On Coiled Tubing and Sand Carryover Damage Costs with EnerCorpLocation: Haynesville ShaleThe ProblemA client in the Haynesville was looking to reduce expenses while eliminating the...
Haynesville client mitigates HSE risks and lowered non-productive time with 99.7% sand capture
Case Study, Flowback, Flowback 2.0, Haynesville, Oil And Gas, Oilfield, Sahara Advanced Cyclone, Sahara CycloneOver the course of the 35-day flowback, the custom-engineered solution flawlessly executed the job. The client experienced no sand carry over to downstream equipment and zero washouts in the iron, manifold, or test separators....
Operator in Haynesville saves over $16,000 in Flowback Chargebacks
Case Study, Flowback, Flowback 2.0, Haynesville, Oil And Gas, Oilfield, Sahara Advanced Cyclone, Sahara CycloneAs expected, the Sahara Advanced Cyclone captured well over 97% of sand and prevented carry over to downstream equipment, saving thousands....
Permian operator saves 26% on the day rate with eFlowback
Case Study, eFlowback, Flowback, Flowback 2.0, Oil And Gas, Oilfield, Sahara Cyclone, OptionaleFlowback, which combines automation, measurement systems, and cloud-based software, enables operators to enter the next level of flowback....
Sahara Advanced Cyclone reduces damage charges in the Haynesville by capturing over 99% of sand
Case Study, Sahara Advanced Cyclone, Sahara CycloneOver the course of the 16-day flowback, the Sahara Advanced Cyclone captured well over 99% of the sand produced on this well. See the results....
Sahara Advanced Cyclone Captures Over 99% of Sand
Case Study, Sahara Advanced CycloneThermal imaging shows EnerCorp’s Sahara Advanced Cyclone captures over 99% of sand, keeping test separators clean....
Production Equipment Case Study
Case StudyEnerCorp Creates Customized Sahara Advanced Cyclone for Supermajor IOC...
Haynesville Shale Flowback Case Study
Case StudyEXPERIENCE MATTERSMojave Dual Cyclone reduces chargeback expenses by $25,587 on 15-day flowback jobShare this PostHaynesvilleShaleIP Peak5 MMSCF/ day Gas100 BBLs/ day Water1500 psiflowing pressureTHE PROBLEMSand...